Customization: | Available |
---|---|
Warranty: | 1 Year |
Shaping Mode: | Injection Mould |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Material | ABS,PP,PC,PA,PMMA,PS,POM and etc. |
Runner | Cold/Hot runner |
Cavity | Multi or single cavity |
Standard parts | Hasco, DME,MISUMI |
Design software | UG,AutoCAD |
Treatment | Heat treatment and Nitriding, polish, etc. |
Lead time | 30-60 Days |
Packing | Plywood for mold,Carton for molding or customized |
Design process
Step 1: Analyze product drawings
Step 2: Create a Design for Manufacturability (DFM) report
Step 3: Conduct mold process analysis
Step 4: Design tooling drawings
Step 5: Mold making
1. We have been specializing in mold design and production for over 17 years, with a professional design team of about 20 people
2. Update product videos and pictures at any time during the production process to reassure customers
4. Professional pre-sales and after-sales service, 24-hour online response
5. Samples can be used for quality inspection at any time and test reports can be provided quickly
6. Timely delivery, sincere cooperation with customers
On sale services:
We have a strong team of designers who will support our clients in their research and development. We can create 3D maps, models, and drawings of the product, then make modifications according to the customer's requirements and send them for approval. We will also provide our technical advice to customers based on our experience and knowledge.
After-sale service:
If there are quality issues with our products during the warranty period, we will provide you with the best solution as soon as possible; If you have any problems using our molds, we will provide you with professional communication.
1.Q: How can I get the quotation?
A: Please send us the product materials, quantity, requirements, samples or drawings you need
2.Q:What kind of file can you read?
A:3D:STP,X-T,2D: DWG,DXF,PDF
3.Q:When can I get the samples and your main order time?
A: For samples: 10-30 days after start to make mold.
For order: 35-40 days, the accurate time depends on product.
4.Q:Where is the location of your company?
A:We are in Qingdao, China. Welcome to visit.