Air Cleaner Parts Plastic Injection Mold

Product Details
Customization: Available
Shaping Mode: Injection Mould
Surface Finish Process: Polishing
Manufacturer/Factory & Trading Company
Gold Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Year of Establishment
2013-07-22
Annual Export Revenue
739010.91 USD
  • Air Cleaner Parts Plastic Injection Mold
  • Air Cleaner Parts Plastic Injection Mold
  • Air Cleaner Parts Plastic Injection Mold
  • Air Cleaner Parts Plastic Injection Mold
  • Air Cleaner Parts Plastic Injection Mold
  • Air Cleaner Parts Plastic Injection Mold
Find Similar Products

Basic Info.

Model NO.
S02-1-005
Mould Cavity
Single Cavity
Plastic Material
ABS
Process Combination Type
Single-Process Mode
Application
Household Appliances, Furniture, Electronic
Runner
Cold Runner
Design Software
UG
Installation
Fixed
Certification
ISO
Standard
DME
Customized
Customized
Resin
ABS
Cavity
1X2
Lead Time
20-30 Days
Hot Runner
Yudo
Transport Package
Wooden Box
Specification
CE/RoSH
Trademark
Root
Origin
Qingdao Shandong
HS Code
8480710090
Production Capacity
360 Sets/Year

Product Description


Air Cleaner Parts Plastic Injection MoldAir Cleaner Parts Plastic Injection MoldAir Cleaner Parts Plastic Injection MoldAir Cleaner Parts Plastic Injection Mold
Item: Plastic Injection Mold

Part Material: PC/PP/PBT/ABS/PMMA/PU/PE/PVC
Core &Cavity Steel: P20/H13//GS2344/NAK80/ASSAB718HASSAB8407
Mold Base Steel: P20/1050/S50C/
Runner: Hot or Cold
Gate Type: Sprue Gate/Pin Point Gate/Edge Gate/Submarine Gate/Fan Gate/Ring Gate
Cavity No: Single or Multiple.
Mold Base Standard: DME/LKM/HASCO/Etc.
Spare Parts Standard: DME/HASCO/DAIDO/MISUMI/Customized is acceptable.
Mold Life: 30k-1, 000 k
Cycle Time: 10-120 s
Lead Time: 30-45 days
Injection Machine: 50-1200 Ton


Specialize in plastic Injection Mold/Hot Runner Mold/Gas Assistant Mold/High Glossy Mold/2K Injection Mold/Over Mold/IML/Stack Mold.
Professional Auto Engine Part Mould Manufacturer over 10 years, certificated by ISO 9001: 2008.


Advantage:
High quality & competitive price & professional skills.
In house strict quality control.
On time delivery.
All mold could be produced automatically

Offered Service:
Mold progress report and tooling schedule will be provided weekly.
The first testing sample for buyer's inspection and work out improvement requirements will be provided.
Mold testing video, 2D part drawing and 3D mold design before shipment will be provided.

Payment and Delivery
Payment: TT 50% in advance, Balance before shipment
Delivery Time: 30-45 days
Specification
Design Software: UG/CAD
Analysis Software: Moldflow
Preferred Formats: STP/IGES/UG
Design Time: 7-15 days
Manufacture Time: 20-30 days
Delivery Time: 30-45 days
Updated on 17/06/20 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier