Specially serve for customized products, provide one-stop plastics solutions, which include plastic components mechanical design, mold design, mold fabrication, plastic components manufacturing and secondary processing services.
Advantage:
1. With more than 10 year experience in exported mold, especially for automotive molds & household molds, certificated by ISO9001:2008
2. Professional marketing engineer & project engineer promoted from mold designer with rich technical knowledge.
3. 2-3days fast response for inquiry, simple or urgent inquiry can be replied in one day.
4. CAE analysis is available if necessary.
5. Exported about 100sets molds to USA & Europe.
6. In house strict quality control.
7. Fast and on time delivery.
8. All molds can work automatically.
Offered Service:
1. Weekly mold progress report with photos available.
2. Mold testing video/2D&3D drawings of mold provided before shipment.
Item: Plastic Injection Mold
Part Material: PC/PP/PBT/ABS/PMMA/PU/PE/PVC
Core &Cavity Steel: P20/H13//GS2344/NAK80/ASSAB718HASSAB8407
Mold Base Steel: P20/1050/S50C/
Runner: Hot or Cold
Gate Type: Sprue Gate/Pin Point Gate/Edge Gate/Submarine Gate/Fan Gate/Ring Gate
Cavity No: Single or Multiple.
Mold Base Standard: DME/LKM/HASCO/Etc.
Spare Parts Standard: DME/HASCO/DAIDO/MISUMI/Customized is acceptable.
Mold Life: 30k-1, 000 k
Cycle Time: 10-120 s
Lead Time: 40-60 days
Injection Machine: 50-1200 Ton
Payment and Delivery
Payment: TT 50% in advance, Balance before shipment
Delivery Time: 30-45 days
Offered Service:
Mold progress report and tooling schedule will be provided weekly.
The first testing sample for buyer's inspection and work out improvement requirements will be provided.
Mold testing video, 2D part drawing and 3D mold design before shipment will be provided.
Payment and Delivery
Payment: TT 50% in advance, Balance before shipment(negotiable).
Delivery Time: 30-45 days
Specification |
Design Software: |
UG/CAD |
Analysis Software: |
Moldflow |
Preferred Formats: |
STP/IGES/UG |
Design Time: |
7-15 days |
Manufacture Time: |
20-30 days |
Delivery Time: |
30-45 days |