• Hair Dryer Plastic Cover with Spray Coating
  • Hair Dryer Plastic Cover with Spray Coating
  • Hair Dryer Plastic Cover with Spray Coating
  • Hair Dryer Plastic Cover with Spray Coating
  • Hair Dryer Plastic Cover with Spray Coating
  • Hair Dryer Plastic Cover with Spray Coating

Hair Dryer Plastic Cover with Spray Coating

Standard: Dme
Surface Treatment: Electroplating
Energy Source: Ultrasonic
Material: Plastic
Hot Runner: Yudo
Core Steel: Customized
Customization:
Gold Member Since 2014

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
RTPP
Lead Time
60-90 Days
Injection Machine Size
780-1200 Tons
Shaping Mode
Injection Mould
Surface Finish Process
Polishing
Mould Cavity
Single Cavity
Plastic Material
PA6+15GF
Process Combination Type
Single-Process Mode
Design Software
Ug
Transport Package
Wooden Box
Specification
CE/SGS/RoSH
Trademark
Root
Origin
Qingdao Shandong
HS Code
8480790090
Production Capacity
180 Sets/Year

Product Description

Professional Plastic Injection Mould Manufacturer with about 10 years experience, specializing in Plastic Injection Mould with Cold&Hot Runner/Gas Assistant Mould/High Glossy Mould/2K Injection Mould/IML/Stack Mould.

Specification:
Part Material: PC/PP/PBT/ABS/PMMA/PU/PE/PVC
Core &Cavity Steel: P20/H13//GS2344/NAK80/ASSAB718HASSAB8407
Mold Base Steel: P20/1050/S50C/
Runner: Hot or Cold
Gate Type: Sprue Gate/Pin Point Gate/Edge Gate/Submarine Gate/Fan Gate/Ring Gate
Cavity No: Single or Multiple.
Mold Base Standard: DME/LKM/HASCO/Etc.
Spare Parts Standard: DME/HASCO/DAIDO/MISUMI/Customized is acceptable.
Mold Life: 30k-1, 000 k
Cycle Time: 10-120 s
Lead Time: 30-45 days
Injection Machine: 50-1600 Ton


Advantage:
High quality & competitive price & professional skills.
In house strict quality control.
On time delivery.
All mold could be produced automatically

Offered Service:
Mold progress report and tooling schedule will be provided weekly.
The first testing sample for buyer's inspection and work out improvement requirements will be provided.
Mold testing video, 2D part drawing and 3D mold design before shipment will be provided.

Payment and Delivery
Payment: TT 50% in advance, Balance before shipment(Negotiable).
Delivery Time: 30-45 days
Specification
Design Software: UG/CAD
Analysis Software: Moldflow
Preferred Formats: STP/IGES/UG
Design Time: 7-15 days
Manufacture Time: 20-30 days
Delivery Time: 30-45 days
The information has been udated on 2017-06-20. 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2014

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Year of Establishment
2013-07-22
Annual Export Revenue
739010.91 USD