• Switch Plastic Mould for Home Use
  • Switch Plastic Mould for Home Use
  • Switch Plastic Mould for Home Use
  • Switch Plastic Mould for Home Use
  • Switch Plastic Mould for Home Use
  • Switch Plastic Mould for Home Use

Switch Plastic Mould for Home Use

Shaping Mode: Injection Mould
Surface Finish Process: Polishing
Mould Cavity: Single Cavity
Plastic Material: PVC
Process Combination Type: Single-Process Mode
Application: Car, Household Appliances, Commodity, Electronic, Home Use
Customization:

Contact Supplier

Mr. Jeeloo Yule
Marketing Engineer
Gold Member Since 2014

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
RT-16091709
Runner
Cold Runner
Design Software
UG
Installation
Fixed
Certification
TS16949, CE, ISO, FDA
Standard
DME
Customized
Customized
Hot Runner
Yudo
Core Steel
Customized
Lead Time
60-90 Days
Injection Machine Size
780-1200 Tons
Transport Package
Wooden Box
Specification
CE/SGS/RoSH
Trademark
RootChina
Origin
Qingdao Shandong
HS Code
8480790090
Production Capacity
180 Sets/Year

Product Description

Switch Plastic Mould for Home Use Switch Plastic Mould for Home Use
Switch Plastic Mould for Home UseSwitch Plastic Mould for Home Use
Specilizing in painting spray, laser engraving, printing and assembly in electronics area.


Specification:
Part Material: PC/PP/PBT/ABS/PMMA/PU/PE/PVC
Core &Cavity Steel: P20/H13//GS2344/NAK80/ASSAB718HASSAB8407
Mold Base Steel: P20/1050/S50C/
Runner: Hot or Cold
Gate Type: Sprue Gate/Pin Point Gate/Edge Gate/Submarine Gate/Fan Gate/Ring Gate
Cavity No: Single or Multiple.
Mold Base Standard: DME/LKM/HASCO/Etc.
Spare Parts Standard: DME/HASCO/DAIDO/MISUMI/Customized is acceptable.
Mold Life: 30k-1, 000 k
Cycle Time: 10-120 s
Lead Time: 30-45 days
Injection Machine: 50-1600 Ton


Advantage:
High quality & competitive price & professional skills.
In house strict quality control.
On time delivery.
All mold could be produced automatically

Offered Service:
Mold progress report and tooling schedule will be provided weekly.
The first testing sample for buyer's inspection and work out improvement requirements will be provided.
Mold testing video, 2D part drawing and 3D mold design before shipment will be provided.

Payment and Delivery
Payment: TT 50% in advance, Balance before shipment(Negotiable).
Delivery Time: 30-45 days
Specification
Design Software: UG/CAD
Analysis Software: Moldflow
Preferred Formats: STP/IGES/UG
Design Time: 7-15 days
Manufacture Time: 20-30 days
Delivery Time: 30-45 days
The information has been udated on 2017-06-20. 

Send your message to this supplier

*From:
*To:
avatar Mr. Jeeloo Yule
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Contact Supplier

Mr. Jeeloo Yule
Marketing Engineer
Gold Member Since 2014

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Year of Establishment
2013-07-22
Annual Export Revenue
739010.91 USD